Written By: Chris Ruhlin | Last Updated: October 26, 2026
Time to Read 26 Minutes
If you store diesel, hydraulic oil, lube oil, or something similar, you may have been told you need an SPCC plan. That's a Spill Prevention, Control, and Countermeasure plan, and it's required under 40 CFR Part 112 once you store enough oil. You've probably also heard a lot of different prices for one, which doesn't help when you're trying to budget. A Tier I plan is the simplest and cheapest kind, built for small facilities with a clean spill history, and when RMA writes one it runs about $1,500 to $4,000. You can also fill out EPA's free template yourself for $0 in cash, but it costs you time and comes with some risk, which we'll get into below.
In this article we'll walk through what you'll pay for the plan, what pushes the price up or down, what you'll spend after the plan is done, and how to save money without cutting corners. We're giving real numbers wherever we can, since a pricing article that dances around the numbers isn't worth your time. If you'd rather skip straight to a number for your own site, you can reach out to RMA or use the pricing calculator we point to in the middle of the article.
TL;DR
A Tier I SPCC plan written by an environmental consulting firm runs about $1,500 to $4,000. EPA's template is free, but we don't recommend leaning on it. What you pay depends on the type of plan, how much oil you store, where the site is, how big it is, and what paperwork you already have. After the plan is done, plan on annual training, regular inspections, and maybe some containment fixes. Nobody charges a filing or review fee, because the plan isn't submitted to any agency. The bigger cost to watch is risk: federal penalties for a deficient plan can run up to $59,114 per day, and a spill with a weak plan can cost far more than a properly written one would have.
It depends on what you count. The plan itself is the number everyone quotes, but you can end up paying for an SPCC plan in four different ways, and it's smart to look at all of them before you compare options. For a typical small Pennsylvania facility, they look like this:
Quick background in case you're still sorting out whether this applies to you. You need an SPCC plan if you store more than 1,320 gallons of oil aboveground, counting only containers of 55 gallons or more, or more than 42,000 gallons buried. In Pennsylvania, EPA Region 3 enforces the rule. You qualify for Tier I if your total aboveground storage is 10,000 gallons or less, no single container is bigger than 5,000 gallons, and you haven't had a spill over 1,000 gallons, or two spills over 42 gallons each in a 12-month stretch, in the last three years. Our guide to Tier I self-certified plans goes through those rules in more detail.
One cost you can cross off the list is any agency fee. You don't submit an SPCC plan to EPA or Pennsylvania DEP for approval, so there's no filing fee and no review fee. The plan stays at your facility, and an EPA inspector can ask to see it. DEP's storage tank program is a separate set of rules with its own requirements. Whether a particular tank needs DEP registration, and what that costs, depends on its size, type, and use, so check yours against DEP's storage tank program pages.
Yes, you can. EPA publishes a Tier I template as Appendix G to 40 CFR Part 112, and if your facility qualifies, you can fill it out, sign it, and use it as your plan. It costs nothing. Keep in mind what your signature says, though. You're certifying that you've visited the facility, that the plan follows sound industry practice, that inspection procedures are in place, and that management is committed to following it. That's a federal compliance document with your name on it, so treat it like one.
Most of the time we'd tell you not to build your plan this way. Here's how the tradeoff shakes out:
It's still an option, and if your setup is small and simple and you're willing to learn the rule, it can work. We'd rather you pick it knowing the facts than pay us for something you can handle yourself. If you're weighing your choices, we've written about getting an SPCC plan online and whether online plans hold up. And if you're thinking about having AI fill in the template, we tested that too.
We want to be fair here. A lot of facilities use the template and never have a problem, and for a small, simple site it can be the right call. But when you write your own plan, you take the risk onto yourself, and it's smart to know how big that risk is before you decide. The risk comes in two forms. The first is an inspector finding that your plan is incomplete or doesn't match your site. The second is having a spill and then finding out your plan wasn't up to the job.
An SPCC plan that's missing, incomplete, or not actually followed is a violation of the federal rule, and EPA Region 3 handles enforcement in Pennsylvania. The table below shows the federal civil penalty maximums under the Clean Water Act, as adjusted for inflation under 40 CFR Part 19 for penalties assessed on or after January 8, 2025. These are ceilings, not what most facilities pay, but they show how fast the numbers grow when violations are counted per day.
| Type of penalty | Federal maximum | When it applies |
|---|---|---|
| Administrative penalty, Class I | $23,647 per violation, up to $59,114 total | A lower-level penalty EPA can assess without going to court |
| Administrative penalty, Class II | $23,647 per day of violation, up to $295,564 total | A larger penalty EPA can assess after a formal proceeding |
| Civil penalty for not following the SPCC rule | Up to $59,114 per day of violation | Missing, incomplete, or unimplemented plan |
| Civil penalty for a discharge | Up to $59,114 per day or $2,364 per barrel (42 gallons) discharged | An oil spill that reaches water or shoreline |
| Gross negligence or willful misconduct | At least $236,451, plus up to $7,093 per barrel | The worst-case end of enforcement |
Where a penalty lands inside those ceilings depends on the facts. The Clean Water Act tells EPA to weigh things like how serious the violation was, how much the facility saved by skipping requirements, how culpable it was, its history of violations, and what it did to limit the damage. In plain terms, a facility that took the rule seriously and fell a little short is in a much better spot than one that never tried. If you're facing an information request, an inspection finding, or a penalty, talk to an environmental attorney, since that's their world and not ours.
This is the scenario that costs the most. A spill puts two bills in front of you at the same time. The first is the cleanup, and the party responsible for the spill pays for it. Cleanup cost depends on how much oil got out, what it soaked into, and whether it reached soil, a storm drain, or a stream, so we can't give you one number, but it's often far more than the plan would have cost and far more than the penalty. The second bill is the enforcement, and a spill is the thing that gets regulators looking at your paperwork. If the plan turns out to be thin, wrong about your containment, or not followed, you now have a penalty for the plan on top of the penalty for the spill, and the per-day and per-barrel figures in the table can stack.
Pretty close, yes. We'd describe a well-written plan as insurance you buy once. If you hired somebody who did it right, you know the containment was sized properly, the overfill protection is documented, and the plan matches what's on your site. If a regulator ever shows up, you can hand over a plan you're confident in and records showing you've been following it. Regulators generally treat a facility that has been working to follow the law differently from one that hasn't, and that's built into how penalties get weighed. We can't promise any outcome, and no plan makes you immune. What a good plan does is take away the easiest thing for an inspector to cite and put you in the best position if something goes wrong.
So can you do it yourself? A lot of the time, yes. It just depends on how simple your site is, how comfortable you are with the rule, and how much risk you're willing to carry. If you're unsure, our post on the top SPCC plan violations and fines shows what inspectors tend to find.
Plans get more expensive as they get more complicated, and your facility decides which type you need, not you. The table below compares the three. Our full range across all plan types runs from about $1,500 to $15,000, which is a huge spread, and the type of plan is the biggest reason for it.
| Plan type | Who it's for | Can you use EPA's template? | Cost with RMA |
|---|---|---|---|
| Tier I | 10,000 gallons or less, no container over 5,000 gallons, clean spill history | Yes | About $1,500 to $4,000 |
| Tier II | 10,000 gallons or less, but a container over 5,000 gallons or a spill history that rules out Tier I | No | About $4,000 to $7,500 |
| PE-certified | Over 10,000 gallons, or plans that rely on alternatives a PE has to review | No | About $7,500 to $15,000 |
Tier II is usually where people start hiring a professional, because you can't use the EPA template anymore and the plan needs more detail. PE-certified plans cost the most because a licensed Professional Engineer has to review and certify the plan. We don't have an engineer on staff at RMA, so when a plan needs PE certification, we work with an outside professional engineer licensed in the state the plan is for. That engineer's time is part of the price. We break down each type in our posts on the different types of SPCC plans, Tier II plans, and PE-certified plans.

A range like $1,500 to $15,000 doesn't tell you much until you see where actual jobs land. Here are some typical situations and where they fall, using our pricing as the yardstick:
| Situation | Where it tends to fall | Why |
|---|---|---|
| Small Tier I facility, close to our work area | Low end of the $1,500 to $4,000 Tier I range | Simple plan, no travel added, one site visit |
| Larger Tier I facility with several storage areas | Higher end of the Tier I range | More ground to cover and more to document |
| Tier I facility with an older plan from another firm | About the same as a new plan | We usually start over, since older plans rarely meet our standard |
| Facility with a plan RMA wrote that needs an update | Well below a new plan | We already know the site and the document, so the price follows the size of the changes |
| Tier II facility with a container over 5,000 gallons | Above the Tier I range | No template to lean on, and more to work through |
| Facility over 10,000 gallons that needs PE certification | Toward the higher end of the full range | Full plan requirements plus an outside engineer's review |
| Several near-identical Tier I sites with one owner | Less per site after the first one | We can often develop the rest remotely once we've seen one |
The update row trips a lot of people up. You'd expect an update to cost way less than a new plan, and that's true in one case: when we wrote the plan in the first place. If you've had a plan with us before, or you get one now and only need updates later, updates are usually pretty inexpensive and depend on how much changed. Most people who call us, though, are holding an older plan somebody else wrote, and we typically don't update another firm's plan. If our name goes on it, we're effectively signing off on it, and it has to meet our standard. So we usually build it again from scratch. If the old plan is decent, we can sometimes use it to build the new one faster, and that's where you'll see the price come down. Our post on getting an SPCC plan updated covers your options.
Six things move the price of a plan. Here they are, along with which way each one pushes:
A few things people expect to matter don't really move the price, so you can stop worrying about them:
The quickest way to get a ballpark for your own site is our SPCC pricing calculator, which is below. It takes a couple of minutes, and you get a number without a sales call.
Keep in mind that estimate covers the plan only. The next few sections cover everything around it, starting with one of the biggest swings in the total: where the firm you hire is based.
Travel can swing the price a lot, and it's the thing people forget to ask about. You almost always need a site visit to develop an SPCC plan, because somebody has to see the tanks, the piping, the drainage, and the ground between your storage and the nearest water. If the firm you pick is based across the country, you're paying for flights or a long drive, and maybe a hotel night, on top of the plan. Pennsylvania is our backyard, so when you hire RMA, we do the site visit without adding any travel cost. If you're tempted by a lower price from a firm in the middle of the country or on the West Coast, add travel to their quote first. The savings often disappear.
When you compare quotes, ask every firm these questions:
We'll write a plan remotely in some cases, but it's not common. The best fit is an owner with several facilities that all have basically the same setup. We visit one, learn how the operation runs, and then develop plans for the others without going to each one. That saves real money. If that sounds like you, our posts on remote SPCC plan costs and whether your facility is a good fit for remote development explain how we decide.
The plan is the part you can see on an invoice, and the rest comes after. For most Tier I facilities none of it is big, but you should know what's coming. Here's what to budget for:
| Ongoing cost | How it usually gets handled | What you'll pay |
|---|---|---|
| Containment improvements | A contractor or your maintenance team, only if the plan shows a gap | Often nothing, sometimes a small purchase |
| Annual training | In-house briefing, online course, or live session | Free in-house, $135 per user for RMA's online course, $500 to $5,000+ for live |
| Regular inspections | Your staff, a professional, or part of an RMA service | Mostly staff time if you do them yourself |
| Five-year review | Review the plan and amend it if needed | Less than a new plan if yours is in good shape |
| Plan updates | Update when you add, move, or remove storage | Depends on the size of the change |
| Agency filing or review | Doesn't apply | $0, since the plan isn't submitted to any agency |
Usually not, and it's the cost people worry about most. Most small facilities need little or nothing beyond some containment, and the fix is often something like a containment pallet, a berm, or moving a drum rack. Bigger fixes, like a built dike or concrete containment, cost more. If a fix involves construction, keep in mind that RMA doesn't prepare building permits or other construction approvals, so you'd work with your contractor or engineer on that part. Our guide to sizing SPCC containment will help you check where you stand before you spend anything.
These two repeat every year. The rule calls for oil-handling staff to get a discharge prevention briefing at least once a year, and you've got three ways to cover it:
Your first round of training is free when you get a new SPCC plan from RMA. Our post on what SPCC training costs has the full breakdown.
Inspections follow the schedule written into your plan, and a lot of facilities walk their tanks monthly and keep the records for three years. Some people hire a professional to do it, in some cases it's part of an RMA service, and plenty of facilities just do it themselves. When you do it yourself, the cost is your staff's time instead of dollars, and that's still a cost, because an hour a month adds up over a year. If you want to make the walk-through quicker, check out our list of the top 10 things to check during monthly inspections.
Your plan needs a review at least every five years, and an update any time your storage changes in a way that affects spill risk, like adding a tank or moving where you fuel. If the plan is current and accurate, a review or update costs a lot less than a new plan. If it's fallen out of date, expect to pay more. Our post on SPCC five-year reviews explains what each one involves.
Usually not, and we're saying that even though we're not the cheapest option out there. The price you pay for a plan isn't the whole cost. If the plan doesn't match your site, or an inspector calls it insufficient, you may end up paying to redo it, plus whatever comes with the enforcement. When you're comparing a low price to a higher one, here's what to look at:
If you're staring at a $1,500 quote and a $4,000 quote, find out what's behind the gap. Sometimes the cheaper one is a fair price for a simple site. Sometimes it's a template with a logo on it.
The best savings come from volume, good records, and hiring a firm close to your site. Here are the main ways to bring the cost down without cutting corners:
It depends on the firm. We're pretty flexible at RMA, and if you need to split your payment into more than one, we're usually fine with that. What we're not set up for is long-term financing, like spreading a few thousand dollars over a long run of small monthly payments. If that's what you need, ask any firm up front how they handle payment terms, because it varies a lot.
They've gone up some, like everything else. The tools environmental professionals use, including mapping software, cost more than they used to, and so does everyone's time. Prices have followed inflation, and we don't see a reason for them to outrun it. Costs have been fairly steady with a slight climb, and we expect more of the same.
We write SPCC plans for facilities across Pennsylvania, and since it's our backyard, we can do the site visit without adding travel costs to your quote. Senior staff do the work, we don't use AI to produce client deliverables, and we publish our pricing because we'd rather you know what to expect before you call. We'll also tell you when you don't need us. If you have a simple Tier I setup and you're comfortable working through EPA's template, that's a fair choice, and we'd rather you make it with the facts than get talked into something bigger. If you'd like to talk it over, you can call us, email us, or fill out the form on our site, with no pressure and no obligation. Start with the pricing calculator for a quick number, or contact RMA and we'll take a look at your facility with you.
Learn everything about SPCC plans, including requirements, costs, and timelines to ensure your facility complies with federal oil storage regulations.
Not sure whether your facility needs an SPCC Plan? Have an existing plan that's due for review? Or do you already know you need one and just want to get the project moving?
Tell us a little about your Pennsylvania facility, the oil you store, and what you're trying to accomplish.
RMA can help you understand which requirements apply, whether you need a new plan or an update, what the project would involve, and what it may cost.
There's no need to have everything figured out before reaching out. That's what we're here to help with.
Want to dig deeper? Check out these additional resources to get a clearer understanding of the SPCC world and how it applies to your facility.
Tags: Pennsylvania SPCC Plans
Whether you need help with a single requirement or want to hand off your entire environmental program, we get it done right, the first time. You'll feel protected, confident in your company's regulatory standing, and ready for whatever comes next.
Tel: 888-RMA-0230 | Email: info@rmagreen
Copyright © Resource Management Associates