Written By: Chris Ruhlin | Last Updated: November 10, 2026
Time to Read 16 Minutes
In a lot of Pennsylvania facilities, the oil spill plan has one person's name on it. If your facility stores enough oil, including diesel for a generator, hydraulic oil, or oil-filled electrical equipment, federal rules may require a Spill Prevention, Control, and Countermeasure (SPCC) Plan, which is a written plan for preventing oil spills and responding to them if one happens. That one person wrote or managed the plan, walked the tanks, ran the yearly training, and kept the binder. Then they took a new job, retired, or moved to another site, and the SPCC work left with them.
The short answer is that the responsibility doesn't leave with them. The duty to keep the plan, the inspections, and the training going sits with the facility owner or operator, so the clock keeps running while you look for a replacement. This article covers where the plan and records are likely to be, how to tell whether inspections, training, and the five-year review are still current, how to name a new responsible person, and how to update the contact information in the plan, all organized into a first-week checklist. If you'd rather not sort it out alone, you can reach out to RMA and we'll help you figure out where things stand.
TL;DR
When the person who ran your SPCC Plan leaves, the legal responsibility stays with the facility owner or operator, but the monthly inspections, annual training, and plan updates often stop without anyone noticing. In the first week, find the plan and every inspection and training record, check what's current, name a new accountable person with management sign-off, and update the contact list in the plan. Changes to names and phone numbers are administrative and generally don't need an engineer, though Pennsylvania DEP expects the owners of registered tanks to report contact changes within 30 days. If the plan or the records can't be found, rebuilding the plan is usually cleaner than patching it.
The SPCC rule, which is 40 CFR Part 112, puts the obligation on the owner or operator of the facility. It doesn't put it on an individual employee. The plan has to carry the full approval of management at a level with the authority to commit the resources needed to carry it out, and it has to name a person at the facility who is accountable for discharge prevention and who reports to facility management. When that person leaves, the plan still names them, and nobody has taken their place on paper or on the ground.
EPA Region 3 enforces the SPCC rule in Pennsylvania, and the federal civil penalty for failing to comply with oil pollution prevention regulations is up to $59,114 per day of violation under the inflation-adjusted table in 40 CFR Part 19. That's the figure for penalties assessed on or after January 8, 2025, and EPA adjusts it periodically. When an inspector visits, the plan itself is usually the first thing they ask to see, followed by signed inspection records and training records. Our articles on who enforces SPCC Plans and the top SPCC Plan violations and fines go deeper on how that process works.
An SPCC Plan isn't a document you finish once. It's a set of recurring jobs, and most of them depended on a specific person remembering to do them. The table below lists what the rule asks for and what we usually see slip first when that person is gone.
| SPCC Requirement | What the Rule Says | What Usually Lapses |
|---|---|---|
| Inspections and records | Inspect according to the written procedures for your facility, and keep those procedures and signed records with the plan for three years (40 CFR 112.7(e)) | Walkthroughs stop, and the signatures stop with them |
| Training and briefings | Train oil-handling personnel, and hold discharge prevention briefings at least once a year (40 CFR 112.7(f)) | The annual briefing date passes with nobody scheduling it |
| Accountable person | Designate a person accountable for discharge prevention who reports to management (40 CFR 112.7(f)) | The plan names someone who no longer works there |
| Contact list | List the facility response coordinator, the National Response Center, cleanup contractors, and the agencies to call after a discharge (40 CFR 112.7(a)(3)) | The first number on the list is a cell phone nobody answers anymore |
| Five-year review | Review the plan at least every five years and sign a statement saying you did (40 CFR 112.5(b)) | The review date comes and goes unnoticed |
| Plan amendments | Amend the plan within six months of a change that materially affects spill potential (40 CFR 112.5(a)) | A tank gets added or removed and the plan never hears about it |
| Copy of the plan | Keep a complete copy at the facility if it's attended at least four hours a day (40 CFR 112.3(e)) | The only copy lives on a former employee's laptop |
The rule doesn't set a fixed inspection frequency. It requires inspections according to the written procedures in your plan, and a lot of plans set those procedures at monthly walkthroughs. If you haven't looked at yours, our list of the top 10 things to do during SPCC Plan monthly inspections shows what a solid walkthrough covers.
Nothing in the rule gives you a seven-day deadline. The first week is simply the pace we recommend, because every day without inspections or a named responsible person adds to the gap you'll eventually have to explain. If your facility has an SPCC Plan, here's the order we'd work in.
| When | Task | What You're Looking For |
|---|---|---|
| Day 1 | Find the plan, on paper and electronically | The most recent version, with its certification page and facility diagram |
| Days 1 and 2 | Gather every record that goes with it | Signed inspections, training sign-in sheets, review statements, amendment log, DEP tank paperwork |
| Day 2 | Walk the site with the plan's facility diagram in hand | Tanks, drums, and equipment that aren't on the diagram, or that are on it and gone |
| Day 3 | Check what's current | Date of the last inspection, the last annual briefing, and the last five-year review |
| Days 3 and 4 | Name the new accountable person | Someone who walks the site, reports to management, and has management's backing |
| Days 4 and 5 | Update the contact list and any DEP registration contacts | Working phone numbers, current names, a cleanup contractor who still has an agreement with you |
| Day 5 | Restart inspections and schedule the next briefing | A dated, signed inspection and a calendar entry for training |
The sections below walk through each step.

Start with the obvious places and then work outward. Check the departed person's desk and shared drive folders, then the email inbox they left behind. Ask your environmental, health, and safety contact or your corporate office whether anyone else keeps a copy. If an outside consultant wrote the plan, call them, because consultants often keep a copy of the final plan and the facility diagram even when the client has lost track of it.
Once you've found the plan, you're looking for more than the plan. Gather the certification page (a Professional Engineer's seal, or the owner's self-certification for a qualified facility), the facility diagram, the signed inspection records from the last three years, training sign-in sheets, the five-year review statement, any amendment log, and the spill history. If any of your tanks are registered with Pennsylvania DEP, pull that paperwork too, since the contact information there needs the same update as the plan. If you're not sure the plan is the current version, compare the tank list and diagram against what's physically on site.
If you can't find the plan at all, or the plan is old enough that the tanks, the contacts, and the procedures no longer match the site, you have two options: amend what's there or start fresh. Which one makes sense depends on how far the plan has drifted. A plan that's mostly right with a few changes is a candidate for an update, and our articles on whether your SPCC Plan can be updated and what to do when your plan is over five years old explain how that works. A plan nobody can find, or one that reflects a facility that no longer exists, is usually better replaced.
We don't typically update plans written by other firms. In most cases we rebuild from scratch, and we'll tell you up front if the plan you have is solid enough to keep. For a Tier I facility, a new plan from RMA generally runs about $1,500 to $4,000, and SPCC plans overall run about $1,500 to $15,000. The range depends on the number of containers, whether secondary containment needs to be evaluated, and whether a Professional Engineer has to certify the plan. When one does, we work with an outside engineer. Our breakdown of SPCC Plan costs covers each of those factors, and the pricing calculator below gives you a number for having us handle the plan.
Sort the inspection records by date and look for the last signed one. A gap of a few weeks is easy to explain. A gap of several months, or records that stop abruptly the day your coordinator left, means the walkthroughs didn't happen. Do the same with training: find the sign-in sheet from the last annual briefing and see whether a year has passed. Then check the plan's review log or signature page for the five-year review statement. If you can't find one, count five years from the date the plan was written or last reviewed.
How you handle the gaps comes next. Don't backdate inspection forms, don't reconstruct signatures, and don't fill in blank lines after the fact. Write down what you found, date it with today's date, restart the inspections now, and hold a briefing for your oil-handling staff as soon as you can schedule one. A five-year review that's overdue can simply be done now, and EPA says an engineer isn't required just to perform it, because the owner or operator documents it with a signed statement. Our articles on SPCC Plan five-year reviews and annual SPCC training cover what each one involves, and our online training library is one way to get staff briefed quickly.
If the gaps are long, or you find a past spill that was never reported or documented, talk to an environmental attorney before you decide how to handle the paperwork. That's a liability question as much as a compliance one, and it's not something we'd want you to answer from a blog post.
The rule asks for a person accountable for discharge prevention who reports to facility management. It doesn't require a particular job title, so the best choice is whoever is on site every day, understands how oil moves through the facility, and can get a tank fixed or a drum moved without a three-week approval process. A plant manager or maintenance supervisor often fits. Name a backup too, so the next departure doesn't leave the same hole.
The plan also has to carry the approval of management with the authority to commit resources. If the manager who signed it has left, have current management sign the approval page so the plan reflects who's in charge today. If the departure came with a sale or a change of operator, update the owner and company names throughout. EPA's position is that a facility may be able to keep operating under the existing plan after an ownership change if procedures stay the same, but if operations change in a way that materially affects spill potential, the plan has to be amended. If the amendment is technical, a Professional Engineer generally needs to certify it unless your facility qualifies for self-certification, and our article on Professional Engineers and SPCC Plan requirements explains when that applies.
The plan's contact list has to include the facility response coordinator, the National Response Center, any cleanup contractors you have an agreement with, and the federal, state, and local agencies to notify after a discharge. Call every number on it. Confirm the people still work there, the numbers connect, and your cleanup contractor still has an agreement with you and still covers your site. This is the page someone reads in the middle of a spill, so a dead number on it costs real time.
Changes to names and phone numbers are administrative. EPA treats changes that don't require good engineering practice as non-technical, which means they don't need a Professional Engineer's certification. The six-month amendment window in 40 CFR 112.5(a) applies to changes that materially affect spill potential, which a new phone number doesn't, but we'd still make the update right away and log the date and who made it.
If any of your tanks are registered with Pennsylvania DEP, the registration has its own contact information. Under 25 Pa. Code 245.41, tank owners submit an amended registration within 30 days of a change of owner or operator, or a change of contact, mailing address, or telephone number. DEP's Storage Tank Registration Amendment Form (2630-FM-BECB0607) handles those updates, and the storage tank ePermitting system is another way to submit them. While you're at it, check the other places the same person was listed, such as Tier II reports and any other environmental plans or permits that name an emergency contact.
If you'd like a second set of eyes, we're glad to look at what you have. We're a family-run firm, and senior staff do the work rather than handing it to junior people. We can review the plan and the records, tell you whether the plan is solid enough to keep or needs to be rebuilt, help you name the new responsible person and update the contacts, and get your inspections and training back on a schedule. Initial SPCC training is free with a new RMA plan. And if you don't need us, because the plan is current and you just need to swap a name and a phone number, we'll tell you that too.
There's no obligation and no pressure. You can call us, send an email, or fill out the form on our website, and a member of our team will follow up. When you're ready, contact RMA and tell us what happened, and we'll help you work out the next step.
Learn everything about SPCC plans, including requirements, costs, and timelines to ensure your facility complies with federal oil storage regulations.
Not sure whether your facility needs an SPCC Plan? Have an existing plan that's due for review? Or do you already know you need one and just want to get the project moving?
Tell us a little about your Pennsylvania facility, the oil you store, and what you're trying to accomplish.
RMA can help you understand which requirements apply, whether you need a new plan or an update, what the project would involve, and what it may cost.
There's no need to have everything figured out before reaching out. That's what we're here to help with.
Want to dig deeper? Check out these additional resources to get a clearer understanding of the SPCC world and how it applies to your facility.
Tags: Pennsylvania SPCC Plans
Whether you need help with a single requirement or want to hand off your entire environmental program, we get it done right, the first time. You'll feel protected, confident in your company's regulatory standing, and ready for whatever comes next.
Tel: 888-RMA-0230 | Email: info@rmagreen
Copyright © Resource Management Associates