Written By: Tate Hunter | Last Updated: October 13, 2026
Time to Read 16 Minutes
Just about every environmental consultant in Pennsylvania will tell you they do industrial stormwater work. That's easy to say and hard to check, and if you've never been through a PAG-03 application, you don't have much to measure the claim against. The permit is only one piece of the job. You're also hiring someone to walk your facility, write a plan that meets Pennsylvania's requirements, and stay reachable when the Department of Environmental Protection (DEP) comes back with questions.
This article walks through how we'd choose a PAG-03 consultant if we were sitting on your side of the table. We'll cover the questions that separate Pennsylvania experience from general stormwater experience, what a real site visit looks like, what a PPC Plan should and shouldn't be, how to compare proposals without getting steered by the lowest number, and what comes after DEP approves your coverage. If you'd rather talk it through with a person, you can reach out to RMA at any point, and we'll tell you straight whether you need a consultant at all.
TL;DR
Hire someone with recent Pennsylvania PAG-03 experience who checks which permit you need before selling you one, walks your facility, and writes a Pennsylvania plan built around your site instead of a template with your name on it. Compare what each proposal includes before you compare prices, and find out who will do the work. Ask what help is available after DEP approves your permit, since sampling, inspections, training, and reporting continue for as long as you hold it.
Stormwater permitting isn't the same from one state to the next. Pennsylvania has its own terminology, its own requirements, and its own way of handling applications. A consultant with twenty years of stormwater work in other states can still be learning Pennsylvania's program on your project, and you'd be the one paying for the education.
So start with a simple question. How many PAG-03 applications have you prepared recently, and what kinds of facilities were they for? You should get a specific answer. "A concrete plant, a metal fabricator, and two truck yards in the last year" is the kind of reply you want. "We handle all kinds of industrial clients" tells you nothing.
Then ask what happened after they submitted. Did DEP come back with questions, and how did they respond? Anyone who has done this work more than a handful of times has a story about that, and the way they tell it shows you how they handle problems once you've signed. If you want a refresher on how these permits work before you start interviewing people, our guide to NPDES and stormwater permits covers the basics.
A good consultant figures out which permit path you're on before pitching you anything. PAG-03 is Pennsylvania's general permit for stormwater from industrial activity, and it fits plenty of facilities. It doesn't fit all of them. Some facilities qualify for a No Exposure Certification because their industrial materials and activities stay under cover and away from rain. Others have conditions that push them toward an individual permit instead.
Getting this wrong costs you either way. If you qualify for a No Exposure Certification and get sold a full PAG-03 package, you're paying for plans, sampling, and ongoing obligations you didn't need. If you do need PAG-03 and get steered toward a no exposure filing, you can end up operating without the coverage your site requires. Our post on general, individual, and no exposure permits compares the options, and our explanation of what no exposure means shows what qualifying looks like.
This is also where a consultant shows you how they operate. If your facility is small and simple, you may be able to handle the application yourself, and a consultant who says so has earned some trust. We wrote Can You Get a PAG-03 Permit Yourself? for exactly that reason. Whether you hire us or someone else, hire a person who's willing to tell you when you don't need to hire anyone.
For most of these projects, somebody has to walk your facility. They need to see what you're doing outside, figure out where pollutants could come from, follow your stormwater from the moment it hits the ground to the place it leaves your property, and locate your outfalls. That's hard to do from an office chair.
Be skeptical of anyone who says they can build your entire PAG-03 application from a questionnaire and Google Maps. A satellite image doesn't show the storm drain behind the loading dock, the pile of material under a tarp, or the downspout that ties into a pipe nobody has a record of. Facility managers usually know their site well, but they can't always say where the water goes, because nobody has ever needed to ask. A good consultant asks, then walks the site to check the answer.
Ask who's coming out, how long they expect to be there, and what they'll want to see. Anywhere your materials or operations are exposed to rain is part of what's called stormwater associated with industrial activity, so expect them to spend most of their time outdoors. Ask what they'll bring back, too. A decent answer includes a drainage map, notes on what's exposed to the weather, and a list of your outfalls. If a proposal says nothing about a site visit, ask why.
Technical skill covers half of it. The other half is whether you'll get answers when you call. Can they explain the permit without burying you in jargon? Do they respond to your questions, or send you back to a form? Do they return your calls? You'll be working with this person for weeks during the application and possibly for years afterward, and a consultant who's hard to reach during the sales process won't get easier to reach once you've paid.
Read their reviews, and read what people say about working with them, not only the star rating. Then spend ten minutes on their website. A good-looking site doesn't prove anyone is a good consultant. Anybody can hire a designer and fill a site with pages promising "comprehensive environmental support." That part is cheap.
It's different when a company has spent years publishing detailed information about the work it does, what it costs, how long it takes, and what can go wrong. That takes real knowledge and a willingness to be held to it. It won't tell you whether they're the right fit for your facility, but it shows you how they think and how they'd explain things to you, and you get to see all of that before you've spent anything. We've put a lot of years into our own site for that reason.

Pennsylvania doesn't use the term SWPPP the way most states do. It requires a PPC Plan, short for Preparedness, Prevention and Contingency Plan. The two documents do similar jobs, which is why people mix them up, but they aren't the same document, and Pennsylvania has its own expectations for what a PPC Plan covers.
So when a consultant starts talking about preparing your SWPPP, pay attention. It can mean they haven't done much PAG-03 work. People do use SWPPP as shorthand, so one slip in conversation isn't a reason to cross someone off the list, but a consultant who does this regularly will use the right name without thinking about it. We break down the differences in our comparison of SWPPPs and PPC Plans for PAG-03, and if you want the general-purpose background, our explanation of what a SWPPP is covers it.
Your PPC Plan should be built around your facility: your operations, equipment, materials, drainage, pollutant sources, and procedures. A generic template with your company name dropped in doesn't count. This is the document your employees are supposed to follow and the one DEP expects you to be following, so it has to describe what happens at your site, not at a typical site.
Ask to see a redacted sample of a plan they've written, and ask how much of it comes from a template. Some standard language is fine. The facility description, the drainage, the materials, and the procedures should be written fresh for you.
Don't compare prices until you've compared scopes. One proposal might include the site visit, drainage maps, the PPC Plan, the application, training, and help responding to DEP. Another says "PAG-03 permitting services" and leaves you to guess what that covers. Both arrive with a price, and the lower one may simply be the one that left things out.
Lay the proposals side by side and check each line below. If a proposal doesn't mention one of them, ask whether it's included, billed separately, or not offered.
| Scope Item | What a Clear Proposal Says |
|---|---|
| Site visit | Who comes, how long they stay, and what you get back |
| Drainage and outfalls | Whether they map them or you're expected to supply the maps |
| PPC Plan | Written for your facility, with a named writer and reviewer |
| PAG-03 application | Preparation and submission |
| DEP questions | Whether responding to DEP is included or billed by the hour |
| Employee training | Included, extra, or left to you |
| After approval | What ongoing help is offered and how it's priced |
Then ask who's doing the work. Who's coming to your site? Who writes your PPC Plan? Who reviews it? Who's your contact after you sign? It doesn't have to be the senior person who sold you the project, but you should know exactly who you're hiring. At RMA, senior staff do the work, and we say so up front. It's also reasonable to ask whether any part of your deliverables is produced by AI. We don't use AI to produce client deliverables, and any firm you hire should be willing to tell you how it handles that.
On price, the lowest quote usually got that way by trimming the site visit or leaning on a template, and you find out when DEP sends questions or the plan doesn't match your site. We're not the cheapest option and we don't try to be. If you want a ballpark for what RMA's help with your permit would cost, the pricing calculator below gives you one, and our post on what an NPDES permit costs in 2026 goes through what drives the numbers.
Approval isn't the finish line. You've still got sampling, inspections, employee training, reporting, and possibly corrective action if results come back high or something goes wrong. Ask every consultant on your list how they'd handle that stretch, because the answer tells you whether they plan to stick around.
Plenty of facilities can handle a lot of this internally, and a good consultant will say so. Sampling is a good example. Your staff are on site when it rains, and with some training they can collect samples correctly. Our post on PAG-03 stormwater samples walks through the process, and our guide to Pennsylvania's eDMR reporting covers submitting the results.
Where outside help makes sense depends on your staff and your site. Some facilities want backup for inspections, and it helps to know what happens during a PA DEP stormwater inspection before one shows up. Others want a second set of eyes when sampling comes back high, and we've written about what to do when stormwater results are high. Training is another common need, and our online training library is one way to cover it. If you aren't sure who needs it, our post on whether stormwater training is required is a good place to start.
If you want help with any of these, make sure the consultant you pick offers it, and get the price before you sign. Switching consultants after approval is possible, but you'd be handing a new person your plan, your history, and your sampling records.
Most of the warning signs are things we've already covered, and it helps to see them in one place. Any one of these might have an innocent explanation, but if you're hearing several, keep looking.
Don't make this harder than it needs to be. Look for real Pennsylvania PAG-03 experience, a legitimate site evaluation, a PPC Plan written for your facility, a scope that tells you exactly what you're getting, and people you feel you can work with. If a consultant checks those boxes and answers your questions without fuss, you're most of the way there.
We help facilities across Pennsylvania with industrial stormwater permitting and PAG-03. We start by working out which permit path applies to you, and if that turns out to be a No Exposure Certification or something you can handle yourself, we'll tell you. If PAG-03 is the right fit, we walk your facility, map your drainage and outfalls, prepare your PPC Plan and PAG-03 application, and can help you manage sampling, reporting, and training once you're approved. Our service and company fit guide explains how that works and who we're a good match for.
There's no pressure and no obligation. You can call us, email us, or fill out the form on our website, and you can contact RMA to talk through your situation. Even if you end up hiring someone else, we're glad to answer questions about what to ask them.
Determine if your Pennsylvania facility needs an industrial stormwater permit. Explore permit options, eligibility, and requirements to ensure compliance.
Not sure whether your facility needs PAG-03 coverage, an Individual NPDES permit, or a No Exposure Certification? Tell us a little about your facility and what you’re trying to figure out. RMA can help you understand what applies, what the process involves, and what it would take to get your facility permitted and keep it compliant.
Looking for more information? Start with our Pennsylvania-specific NPDES and PAG-03 resources below, or browse our general stormwater guides on permitting, plans, sampling, reporting, training, and ongoing compliance.
If your facility is located in Pennsylvania, start here. These resources cover PAG-03 permitting, Individual NPDES Permits, No Exposure Certifications, PPC Plans, sampling, reporting, PA DEP inspections, and ongoing compliance.
Whether you need help with a single requirement or want to hand off your entire environmental program, we get it done right, the first time. You'll feel protected, confident in your company's regulatory standing, and ready for whatever comes next.
Tel: 888-RMA-0230 | Email: info@rmagreen