Written By: Tate Hunter | Last Updated: November 26, 2026
Time to Read 22 Minutes
You can't write a credible stormwater plan for a New Jersey facility until you know where your water goes. That sounds easy until you're standing in a yard with six catch basins, a loading dock, and a parking lot that seems to drain in two directions at once. The site map is the document that settles it, and NJDEP and your inspector will both use it to check the rest of your plan. Getting it right comes down to a short sequence: a base map, a walk in the rain, a list of the places water leaves your property, a boundary around each one's drainage area, and a record of what could pollute it.
This guide walks through that sequence in order, explains what NJDEP expects to see on the map for your Request for Authorization (RFA) and your stormwater pollution prevention plan, and includes an example site map. If you'd rather have an expert walk the site with you, you can reach out to RMA at any point.
TL;DR
Start with a site plan or aerial image, then walk the property during or right after rain to watch where water goes. Number every place it leaves the property, draw a boundary around the land that feeds each one, and mark your pollutant sources and controls inside those boundaries. NJDEP's form asks for a map, preferably to scale, that's clearly labeled and dated, and a hand-drawn one is acceptable if it's accurate. Keep the map and the written plan matching, and update both when the site changes.
Two terms get used loosely, so here's how we'll use them. An outfall is a point where stormwater leaves your property, whether through a pipe, a ditch, or an open edge where water sheets off onto the neighbor's lot. A drainage area is the piece of your site whose runoff ends up at one particular outfall. The site map shows both, along with what could pollute that water and what you're doing about it. It belongs to your stormwater pollution prevention plan (SWPPP, which NJDEP calls an SPPP, and which people also call an SP3 or just a stormwater plan).
NJDEP's SPPP form for the site map asks for a map of your site, preferably drawn to scale. It says to use existing engineered drawings if you have them, and it accepts a hand-drawn map as long as every feature is clearly indicated and labeled. The form also has a field for the date of the most recent update. It doesn't spell out a feature list, so the practical standard is whatever lets an inspector stand in your yard and match the paper to the ground. For the 5G2, the application is a Request for Authorization (RFA), which some people still call a notice of intent, and a site map is one of the things you'll want in hand before you file. NJDEP's current forms control what's submitted and what stays on site, so check them.
| Feature | Why it belongs on the map |
|---|---|
| Property line, buildings, paved and unpaved areas | Shows what the site looks like and where water can run. |
| Storm drains, catch basins, and inlets (numbered) | Lets you trace where water goes once it enters a pipe. |
| Outfalls (numbered) and the area draining to each | Shows where water leaves and which part of the site feeds it. |
| Flow arrows | Shows direction, including sheet flow across open ground. |
| Pollutant sources and storage areas (numbered) | Matches the source inventory in your plan. |
| Controls such as covers, berms, and drain inserts | Shows what's actually in place. |
| Non-stormwater drains, like floor drains | Shows water that doesn't belong in the storm system. |
| Legend, north arrow, scale or note, and date | Lets someone else read the map and judge how current it is. |
We cover the broader plan in our SWPPP writing guide and the general map in how to create your own site map. This post goes deeper on the hardest part, working out the drainage areas and outfalls.
Start with the most accurate drawing you can find, because everything else gets drawn on top of it. Existing site plans or survey drawings are the best choice, since they show buildings, pavement, and property lines to scale. Check with whoever built or last expanded the facility, your landlord, or the town's building or engineering department. If those don't exist, a recent aerial image works well as a backdrop. Free online aerial tools are fine for this, though they can be a few years old, so confirm anything that has changed since the photo was taken.
Municipal storm sewer maps and utility plans are the other half of the base map. The town or your sewerage authority may have them, and they show where underground pipes run once water leaves your property. They won't be perfect, and you shouldn't climb into any structure to check them, but they tell you where to look. Crop the base map to your property, print it large enough to write on, and add a north arrow, a scale or an "approximate, not to scale" note, and the date. Then make a few copies, because the first one will get wet and marked up.
Do the walk twice. On a dry day, catalog what's on the site: materials, storage areas, drains, and activities. Then walk again during or right after a rain, because that's when you can see where water goes. Paved areas that look flat often aren't, and a few inches of grade change can send water to a different drain. Bring the marked-up print, a phone for photos, and someone who knows how the yard runs day to day, such as maintenance or shipping and receiving. Fresh eyes help too, since a colleague who doesn't work there daily will notice things you've stopped seeing. Stay out of traffic lanes, skip the walk if there's lightning, and don't open or enter manholes or tanks.
On the rainy walk, draw an arrow wherever you see water moving, and note where it pools. Follow roof downspouts to see whether they feed a drain or the pavement. Look for water that leaves the property without ever touching a pipe, since sheet flow across a lot edge or down a driveway still counts. Also note flow from drains in dry weather and any floor drain you suspect ties into the storm system, which can mean a non-stormwater discharge that belongs in your plan. Our post on finding pollution sources pairs well with this walk, since both feed the same map.

Work backward from the edges of the site. At each catch basin or inlet, ask where the pipe goes next. The answer might be a ditch, a stream, a basin, the ground, the town's storm sewer, or a sanitary or combined sewer. You can often learn the answer from municipal maps, from the sewerage authority, or from watching water emerge during the rainy walk. Infiltration into the ground counts as a destination too. Number each place water leaves, and use the same numbers on the map and in the written plan, so a mismatch between the two doesn't become an inspection finding.
Show sewer-bound drains separately from stormwater outfalls. Water that goes to a sanitary or combined sewer generally falls outside NJDEP's industrial stormwater permit rules and instead answers to the sewerage authority, though most sites drain more than one way. Our posts on sewer-bound drainage and combined sewers explain the difference.
For each outfall, keep a short record: a number, a description of what it is, which direction it faces, and a dated photo taken from a consistent spot. A phone's location tag is a handy way to record where you stood. Photos taken during rain are worth the most, because they show how the outfall behaves rather than how it looks when dry.
Start at the outfall and work uphill. For each outfall, trace which pavement, roofs, and open ground send water to it, and draw a dashed line where the flow would split to a different outfall. That line usually follows a high point: the crown of a driveway, the ridge of a roof, the edge of a curb. Your rainy-day arrows give you the evidence, and the base map's pipes and inlets give you the structure. Label each area to match its outfall (DA-1 for Outfall 1, and so on) so that anyone reading the map can see which land feeds which discharge. If you have rough square footage for each area, note it, but a clear boundary beats a precise number.
| Situation | How to handle it on the map |
|---|---|
| Roof drains tied to a storm pipe | Draw the roof into the drainage area of the outfall that pipe reaches, even if the building sits far from it. |
| Sheet flow off the edge of the lot | Treat the edge as an outfall and give it a number. Open ground still sends water off the property. |
| A pipe that crosses from one area into another | Follow the pipe, not the surface. Pipes can carry water past a surface divide. |
| Runoff from a neighbor entering your site | Mark where it comes in and note it, since it can mix with your runoff. |
| Industrial and non-industrial areas draining together | Show both, and label which parts are industrial so the mix is visible. |
| An area draining two ways | Split it with a line and label each part, or describe the split in the plan. |
If you can't tell where a boundary falls, say so on the map and walk it again in the next rain. A site walk with a professional can settle the hard calls, and it's an area where a second set of eyes is worth having.
Once the drainage areas are drawn, show what sits inside them. Mark each potential pollutant source, such as loading docks, outdoor storage, liquid storage, fueling and maintenance areas, waste containers, wash areas, and dust sources, and give each one a number. Use the same number in your source inventory, so the map and the plan cross-reference each other. Then mark the controls (your best management practices, or BMPs) that apply: covers, berms, containment, lidded containers, and drain inserts. A reader should be able to look at a source, see which outfall its runoff reaches, and see what stands between the two.
The map is a record of current conditions, so it has to change when the site does. If you add a storage pile, move a dumpster, or repave a lot, update the map and the date. An out-of-date map creates more problems than a simple one that's right. Our guide to 5G2 best management practices covers which controls to choose.
Here's a sample map for an invented manufacturing facility. It's not drawn to scale, and your map will have more detail, but it shows how the pieces fit together.
This site has three drainage areas and three outfalls. DA-1 on the west side is a parking lot, and its water flows west to a roadside ditch at Outfall 1. DA-2 holds the production building, loading dock, dumpster, and drums, and its water enters two catch basins that join into one pipe running to the town's storm sewer at Outfall 2. DA-3 is an outdoor storage yard with a berm along its edge, and water sheets east onto the neighbor's property at Outfall 3. The purple floor drain goes to the sanitary sewer, so it's shown but not counted as an outfall. Each numbered source (S1 through S4) ties to a line in the written plan, and each control (C1 through C3) shows what's protecting it. If you read the map from a source to its outfall, you can follow the whole story in a few seconds.
The map does its work long after you draw it. During your inspections, you'll walk each drainage area and check its sources and controls, and the numbering keeps your notes tied to specific places. The 5G2 requires an annual inspection and certification rather than routine sampling, but some industry-specific permits do require sampling, and the outfall numbers tell you where it happens. We don't take samples ourselves, because storm windows make that impractical. We train your team to do it correctly instead, and a clear outfall map is the first thing we'd want in front of them.
The certification is signed under penalty of law, so the plan and map need to match the site. The common failures are the ones you'd expect: a map that's out of date, a map and a written plan that disagree (a different number of outfalls, or controls that appear in one and not the other), a drawing nobody else can read, and a borrowed template that was never checked against the real site. Our guide on the annual report and certification explains what you're signing.
Plenty of facilities can draw this map themselves, and if yours is simple, we'd rather you did. Our post on writing your own SWPPP says so plainly. Where it gets complicated, we can help: a senior member of our team can walk the site with you, review the map you've drafted, or build the map and tie it to the written plan. We know how NJDEP's forms are laid out and where facilities tend to get tripped up. We don't do engineering design or survey work, and we'll tell you if your site needs that from someone else.
There's no pressure and no obligation. You can call us, email us, or fill out the form on our website. If you'd like someone to look over your drainage areas and outfalls, contact RMA whenever it suits you.
Learn about NPDES Stormwater Permits, timelines, costs, and compliance essentials for businesses to manage environmental responsibilities effectively.
Maybe you know you need a permit but don't know which one. Maybe you have an old 5G2 authorization, a stormwater plan that's out of date, or a letter from NJDEP asking for information. Or maybe you're just trying to figure out whether your outdoor operations count as industrial stormwater exposure.
Tell us a little about your New Jersey facility and what you're trying to solve. RMA can review the situation, explain the likely permitting options, and talk through the work, timeline, and cost involved.
Looking for more info? Check out all of our New Jersey NJPDES & stormwater articles here!
Tags: NJPDES Permits
Whether you need help with a single requirement or want to hand off your entire environmental program, we get it done right, the first time. You'll feel protected, confident in your company's regulatory standing, and ready for whatever comes next.
Tel: 888-RMA-0230 | Email: info@rmagreen